The comment periods for the following draft environmental documents have ended:
• San Jose to Merced Project Section Draft EIR/EIS (ended June 23, 2020)
• San Jose to Merced Project Section Revised/Supplemental Draft EIR/EIS (ended on June 9, 2021)
• San Jose to Merced Project Section Draft EIR/EIS (ended June 23, 2020)
• San Jose to Merced Project Section Revised/Supplemental Draft EIR/EIS (ended on June 9, 2021)
The California High-Speed Rail system will connect San Francisco to Los Angeles via the Central Valley
in under three hours. At this station, learn about the status of the statewide program, including:
For more information on the Statewide high-speed rail program, visit the Authority’s website: hsr.ca.gov/about. |