The comment periods for the following draft environmental documents have ended:
• San Jose to Merced Project Section Draft EIR/EIS (ended June 23, 2020)
• San Jose to Merced Project Section Revised/Supplemental Draft EIR/EIS (ended on June 9, 2021)
• San Jose to Merced Project Section Draft EIR/EIS (ended June 23, 2020)
• San Jose to Merced Project Section Revised/Supplemental Draft EIR/EIS (ended on June 9, 2021)
The San Jose to Merced Draft EIR/EIS evaluates the impacts and benefits of introducing high-speed rail between San Jose and the Central Valley and describes how to avoid, minimize, or mitigate project effects.
Four alternatives, along with a no-build option, are evaluated in the document. At this station, you can access the full environmental document and watch videos that explain how this detailed document is organized. See the Authority's website for information about obtaining a copy of the Draft EIR/EIS. Draft EIR/EIS
*On the linked page, scroll down to find Volumes I, II, and III. |